中文版 | English
Comprehensive Power
Employee Training
Technical Team
Quality Assurance System

Employee Training

1 professional training in probation period , after passing the strict evaluation can one mount guard;
2do post training periodicly, and receive new technological and operating methods;
3for the post of special type of work, only after passing the professional training can one hold certificate to mount guard;
4through please come in, walk out, fill new managerial ideas to the managing level;
5educate through specific study of procedure document, regulatory framework.


Collective Discussion Problem Discussion
Quality System Training  

Copyright © 2006-2010 NingBo Fulong Synchronous Belt Co.,Ltd.
Products: timing belt, drive belt, auto timing belt, fan belt, tooth belt
Add:Longshan Town, Cixi City, Zhejiang, P.R.China 315311
Fax:+86-574-63780109, 63781500  I/E Department:+0086-0574-63781333 63787600
http://www.timingbelt.cn  http://www.cnfulo.com  E-mail:fulong@timingbelt.cn